FLIR Product Lead Times

 

Lead times are based on current backlog and daily production rates. Quoted lead times are ex-factory Danderyd, Sweden and do not include logistic delays due to transport, customs, etc.

 

Last update: 23/04/2012

 

Family Part No Camera Model Image frequency (Hz) Lead time standard camera (Working days) Bounce USA
Extra days per each Standard Lens* Extra days per each special lens ** Extra days per each Option *** SE-Job
FLIR ix
393xx FLIR i5/i7
9Hz 5 N/A 
N/A N/A 
On request
FLIR Exx
490xx FLIR Exx
60Hz 5 5
N/A 
N/A 
On request
FLIR Txxx/Bxxx
456xx FLIR T/B
9Hz 10 3
10-30 2
On request
453xx FLIR T/B 30Hz 10 3
10-30 2 On request
450xx FLIR T/B 50Hz 10 3
10-30 2 On request
FLIR T6xx 559xx FLIR T6xx
30Hz 10
5 10-30 5 On request
FLIR P/B/SC6xx 404xx FLIR B6xx/P6xx/SC6xx
30Hz (60/120Hz with windowing)
15
3
10-30 2 On request
FLIR A3xx
429xx FLIR A3xx/SC3xx
9Hz 10 3
10-30 2 On request
480xx/482xx FLIR A3xx
30/60Hz 10 3
10-30 2 On request
FLIR A6xx
550xx 
FLIR A6xx/SC6xx
25/50Hz (100/200Hz with windowing)
10
5 10-30 5 On request
FLIR GF3xx 444xx FLIR GF300/GF320 
60Hz 20
8 5
10-30 N/A On request

442xx FLIR GF306
60Hz 20
8 5
10-30 N/A On request
446xx 
FLIR GF309
60Hz 20
8 5
10-30 
N/A On request
575xx FLIR GF335
60Hz 32

5
10-30 
N/A 
On request
598xx FLIR GF346
60Hz 32
8
5
10-30 
N/A On request

 

* 12/15 deg. 45 deg

** Other lenses: Close-up, 7 gr, 90 gr, protective 

***High Temperature Option/Firewire Option
Lead-time for large quantities on request


Lead times are based on current backlog and daily production rates.  Quoted lead times are ex-factory Santa-Barbara, CA, USA and do not include logistic delays due to transport, customs, etc.

 

Quantity <5 Lead time as quoted
Quantity >5 Call for lead time
BHS-Series 48 hours
D-Series 2 weeks
F-Series 72 hours
H-Series (HF/HM/HG/HS/Scout) 48 hours
M-Series 3 weeks
MS-Series 48 hours
Navigator Static 2 weeks
PathFindIR 48 hours
Photon HRC
12 weeks
PS-Series 48 hours
PT-Series 72 hours
PTZ35/50MS 72 hours
PTZ35x140MS 1 week
Quark 4 weeks
SR-Series 72 hours**
Tau 320/640 72 hours
Tau 2.0
5 weeks
Voyager
1 week
Voyager III 3 weeks

 

**SR(35mm) is quoted at 2 weeks
*****SR-625 is quoted at 3 weeks
****** The following Tau cores are quoted with 4 weeks lead time due to lens holder 261-2124-00:

 

  • 43640013H-xxxxx
  • 43640019X-xxxxx




HomeHome

Cart  

(empty)

New

No new products at this time